ANTHC reached out to KC Corporation install 3 dedicated circuits for shuttle bus engine blocks or oil pan heaters in the parking lot area behind the parking garage at the patient house facility. This was necessary to provide permanent power source for their shuttles drivers to plug in block heaters during winter. Underground utilities were installed that went across the parking lot with metal stub coming up from the ground at the sidewalk for the shuttles to plug in.